Internal construction

Click on all images to enlarge and use the side arrows to move to the next slide in the set.

For this next stage, Cameron MacLean stepped in as a volunteer to guide Alan Parker on the internal joinery.  Cameron ended up doing a large part of the work and was invaluable for his expertise.   He also helped Paul Clark lay the floor.  Taping and filling was done by John and Sean MacLean.  Calum MacLean did the painting.  Ian MacAdam and Roland Crichton did the Electrics.  Wayne Morton Screeded the floor.  Donald MacLean did the plumbing.